Is it commissioning or completion of design?
For much of the commercial real estate world the commissioning of systems is a new idea, but for those of us involved in the design and construction of data centers, commissioning has been with us for many years...
UPS Healthcare: Selecting the Right Technician
The heart of the data center electrical system is the UPS system. UPS systems are highly complex control systems and the maintenance and repair requires specially trained technicians. Assuring that you have the right UPS service technicians is as important as selecting the right UPS system...
What Data Loads are you Designing for?
During the last 6 months, Swanson Rink has conducted an extensive review of operating loads within dozens of data centers built within the last 5 to 10 years. In every case, whether a corporate enterprise data center or a hosting facility, the loads are substantially below the load forecast that was developed during initial design and construction of the project. In some cases, data centers ...
- Swanson Rink Adds 9 new Accredited Tier Designers » Read More
- Gary Orazio Presents "The Impact of Design Assumptions on
Data Center Cooling" at Uptime Institute Symposium on May 16 - Colorado Springs Data Center has achieved LEED-NC Gold Certification